
Indian Railways Sanctions ₹272 Crore Bypass Line to Boost Freight Capacity in Eastern Corridor
Indian Railways has approved an 11 km bypass line between Adra and Joychandipahar in South Eastern Railway at a total cost of ₹272 crore, a

Indian Railways has approved an 11 km bypass line between Adra and Joychandipahar in South Eastern Railway at a total cost of ₹272 crore, a

India’s most consequential freight rail project is now in its final stretch — literally. The last 102-kilometre section of the Western Dedicated Freight Corridor (WDFC),

The Railway Board has directed the Dedicated Freight Corridor Corporation of India Ltd (DFCCIL) to fast-track implementation of the newly announced Dankuni–Surat Dedicated Freight Corridor

Indian Railways has approved an 11 km bypass line between

India’s most consequential freight rail project is now in its

The Railway Board has directed the Dedicated Freight Corridor Corporation