StoreACE Logistics plans to add a 2 lakh square foot Grade A warehouse at Chirner in Uran, Navi Mumbai, with the facility expected to be ready by February 2027. The two-level warehouse will be about 16 kilometres from Jawaharlal Nehru Port, 16 kilometres from Navi Mumbai International Airport and eight kilometres from an Atal Setu entry point. The site gives occupiers road access to both the port and the airport for planning cargo movements and distribution.
What are the specifications of the Chirner warehouse?
The ground-plus-one facility will have clear heights of nine and 12 metres across its two levels. Its floor-load ratings are seven tonnes per square metre on one level and three tonnes per square metre on the other. Each level will include 2,000 square feet of office space. For prospective occupiers, the differences in clear height and floor loading will help determine where they can install racking and store heavier inventory.
How will StoreACE track pallet movements?
StoreACE plans to mount artificial intelligence (AI) vision systems on forklifts to identify pallets and verify where they are picked up and put away. The system is intended to update inventory records in real time as goods move through the warehouse. That would let operators check pallet locations against recorded stock movements during routine handling.
How does the location support port and airport logistics?
The Chirner site is in the Panvel–Uran belt, where proximity to Jawaharlal Nehru Port Authority (JNPA) matters for businesses moving containerised cargo. Road access to Navi Mumbai International Airport (NMIA) gives occupiers a second gateway when planning freight movements, while Atal Setu provides a road link towards Mumbai.
Navi Mumbai International Airport began commercial operations on 25 December 2025 and international operations on 15 July 2026. Separately, IndiGo and Adani Airport Holdings have announced plans for IndiGo to begin international services from the airport in February 2027 and expand them in phases through July.
FAQs
When is the StoreACE warehouse expected to be ready?
StoreACE is targeting February 2027 for the Chirner facility to be ready.
How far is the warehouse from JNPA and Navi Mumbai International Airport?
The site is approximately 16 kilometres from each gateway and about eight kilometres from an Atal Setu entry point.






